Sunday, August 9, 2009

08.07.09 Progress



A panoramic shot showing some of the latest updates:

  • punched the portal holes in the bleachers
  • added bleacher stairs/walls/railings
  • finished basic walls around the interior
  • created the 1934 field
  • added dugout walls
  • closed all seams between elements in the seating bowl (which took longer than you'd think)
  • And most importantly, wiped my laptop clean and installed XP 32 bit, saying goodbye to Vista forever.
Any of the renders I post in the construction state are pulled directly Vectorworks with rough texturing and lighting. Once the model is ready to be skinned, it will be worked into a final state in 3d Studio Max, where Mental Ray will provide a much better result.